Polecat Creek Bridge v1
First iteration of the bridge.
New wood for the 2x10s.
All other materials recycled
Low profile initial design
2 cuts per 2x10, drilled for 3x 3/4 dowel pegs.
Steps on either side are WIP.
CC BY Attribution 3.0 International