Polecat Creek Bridge v1
First iteration of the bridge.
New wood for the 2x10s.
All other materials recycled
Low profile initial design
2 cuts per 2x10, drilled for 3x 3/4 dowel pegs.
Steps on either side are WIP.
CC BY Attribution 3.0 International
Copy and paste the below code into your site to embed this work. Or use oEmbed.
Why is my work here? Report inappropriate Can't view this work?